Wison Engineering and Sabic, debottlenecking project, Jubail Industrial City

We were the technical lead for an ESIA chapter for a proposed benzene production plant at an existing petrochemical facility in Saudi Arabia. The work included noise monitoring, liaison with design engineers, computational noise modelling and assessment against Saudi and Royal Commission Standards.

All phases of the project (design, construction, commissioning, operation and decommissioning) were included in the assessment. The monitoring included an intensive five-day exercise across the existing 2-km2 facility. During the site visits Daniel undertook a site audit of existing operations from a occupational and environmental noise perspective, in line with national standards.