GLA Broadcast Studios
Development of details for the sound isolation of the basement radio broadcast suite within the building, taking into account noise intrusion from all the surrounding areas including the separation between the various studios themselves.
Detail design was undertaken of the air conditioning system to achieve very stringent background noise standards. We supervised the entire installation on site, leading to successful commissioning and operation in Summer 2002.


